In Winner, users can include operating costs in their quotation in the Quotation setup window.
Calculating operating costs
At Alternative level:
- Click the Calculator icon:
- In the Quotation window, click Quotation, located in the bottom right of the window, and select Quotation setup/Summary.
- In the Quotation setup window, select the Calculation tab.
- Under the Calculation tab, in the Additional costs section, located on the left below the Operating costs row, there are two fields; % of item cost price and % of the item sales price.
The % of item cost price adds operating costs to the total purchase price in the quotation.
The % of the item sales price adds operating costs to the total selling price in the quotation. - Click OK.
Related articles
Quotation set-up: additional costs
Additional Costs: Discount (2) and (3)
Additional Costs – What can I do with the Ellipsis ‘…’ button?
Additional costs: What does the ticking the Visible box change?
How to add installation costs to a single project or multiple projects