When you have planned with two manufacturers which can do block calculations, you need to split the plan in two.
Winner can only do a block calculation with the manufacturer/catalogue which is selected in the beginning in Drawing settings
-
Make a copy of the plan: Go to the Alternative menu > click on Save as.
- Open up the second alternative you just created and change the catalogue:
-
Click on the Alternative menu > Change catalogues.
-
Click on the first catalogue shown in the window and click on Change.
-
Select the second manufacturer you use in that alternative and click on OK.
-
When you have to change codes it is very important that every code in the second row New code stays at ** Keep original code and supplier **.
- Then you will be asked about the model information, check there that everything is set correctly.
After all these steps, the manufacturers are now swapped and you are able to do a block calculation with the second manufacturer.